CEL 774 CONSTRUCTION PRACTISES Concrete: Production (Pre-fabrication ) B. Bhattacharjee CIVIL ENGINEERING DEPARTMENT IIT DELHI DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 1 Definition – PREFABRICATION REFERS To PRODUCTION AWAY FROM ACTUAL SITE OF CONSTRUCTION. – WITH REFERENCE TO PRE CAST CONCRETE CASTING IS DONE IN ONE PLACE AND IS USED ELSEWHERE DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 2 Advantages • ADVANTAGES OF PRECAST CONCRETE PARALLEL ACTIVITIES, REDUCED TIME • FACTORY LIKE BETTER QUALITY CONTROL EXPERIENCE GAINED BY WORK FORCE THROUGH R EPETATIVE WORKS. • STANDARDIZATION Is POSSIBLE, ADVANTAGES OF MODULAR COORDINATION CAN BE REALIZED. • IN THE LONG RUN IT MAY BE ECONOMICAL • TECHNOLOGICALLY ADVANCED INDUSTRIALIZED CONSTRUCTION AND APPLICATION OF ROBOTICS IS POSSIBLE DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 3 Disadvantages – BUSINESS SUSTAINABILITY IS MARKET DEPENDENT – CAN INTRODUCE MONOTONY, MAY NOT BE PLEASANT TO LOOK AT DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 4 TYPES OF PREFABRICATION PLANT – PERMANENT PLANT – FIELD PLANT – FABRICATION ON A BUILDING SITE THREE MAIN GROUPS OF ACTIVITIES 1) MAIN PRODUCTION ACTIVITY 2) AUXILIARY PRODUCTION ACTIVITIES 3) MANAGERIAL, TECHNICAL AND GENERAL SUPPORT DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 5 LAYOUT B. Bhattacharjee DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 6 CAPACITY & SYSTEMS – Q = MIn (Q,, Q2 , Q,.-.) – Q = Qz = Q 3+. = Q TWO BASIC TYPE OF PRODUCTION SYSTEMS 1)STATIONARY MOULD, 2)MOVABLE MOULDS DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 7 STATIONARY & MOVABLE MOULDS B. Bhattacharjee DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 8 MOVABLE MOULDS B. Bhattacharjee DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 9 ELEMENTS HANDLING RAILMOUNTED GANTRY (PORTAL) CRANE, WHEEL MOUNTED GANTRY CRANES OVERHEAD CRANES TOWER CR AN ES MOBILE CRANES B. Bhattacharjee DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 10 STORAGE CAPACITY – THE STORAGE CAPACITY OF STOCKYARD THE MINIMUM TIME NECESSARY For CONCRETE TO DEVELOP s u FF | ((E/y T STRENGTH PRIOR TO ERECT | ON (T 1) AL = TI Q – AN ADDITIONAL BUFFER STORAGE FOR POSSIBLE INTDRRUPT lou OF PRODUCTION AT CAST IN a YARD OR PLANT. Tz DAYS ERE (Tom is THE B/31=F/IR A 2 = Tz Q – INTERRUPTION OF ERECTION ON SITE CAN BE ACCOUNTED FOR Tz DAY s A 3 = T 3 Q – A FLEXIBILITY OF PRODUCTION PLANNING B. Bhattacharjee DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 11 B. Bhattacharjee DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 12 B. Bhattacharjee DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 13 B. Bhattacharjee DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 14 B. Bhattacharjee DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 15 THANK YOU FOR HEARING DEPARTMENT OF CIVIL ENGINEERING, IIT DELHI 16